Mining intelligence · Project
Prince Silver Project
- Linked companies
- 1
The asset
Project overview
The past-producing Prince Silver Project is in the Pioche Mining District of Lincoln County, Nevada. It is reached from Pioche by dirt roads or State highway 320, with gravel and dirt roads across much of the property.
Source Prince Silver Builds Momentum Toward Maiden Mineral Resource Estimate After Completing More than 10,000 m of Drilling · Aug 27, 2026 · 43-101-Technical-Report-Prince-Mine-May-20-2025-final · page 13 · May 19, 2025 · Prince-Silver-October-2026-Full-Presentation-1-1 · page 1 · Oct 1, 2026
The project is a bedded carbonate replacement deposit with stacked mineralized horizons. Drilling has intersected silver-polymetallic mineralization in the Lyndon Limestone, Pioche Shales and Combined Metals Bed.
Source Prince-Silver-October-2026-Full-Presentation-1-1 · page 4 · Oct 1, 2026 · Prince Silver Appoints Patrick Toth as Vice President, Exploration and Announces Investor Relations Engagement · Oct 26, 2026 · Two of the Widest Silver Intersections to Date at Shallow Depths: 47 Metres at 68.2 g/t Silver (119.1 g/t Silver Equivalent) and 37 Metres at 86.3 g/t Silver (146.3 g/t Silver Equivalent) · Oct 6, 2026
As of September 27, 2026, Prince Silver had completed 41 holes totaling 11,251 metres in its ongoing reverse-circulation program. The company reported Lyndon Limestone intersections of 47.24 metres at 68.17 g/t Ag in PRC-59 and 36.58 metres at 86.30 g/t Ag in PRC-60; lengths are downhole measurements. No mineral resource had been established in the company's latest resource update. Prince Silver plans a maiden resource estimate for Q1 2027.
Source Two of the Widest Silver Intersections to Date at Shallow Depths: 47 Metres at 68.2 g/t Silver (119.1 g/t Silver Equivalent) and 37 Metres at 86.3 g/t Silver (146.3 g/t Silver Equivalent) · Oct 6, 2026 · Prince Silver Appoints Patrick Toth as Vice President, Exploration and Announces Investor Relations Engagement · Oct 26, 2026
- Region
- North America
- Location
- Pioche Mining District, Lincoln County, Nevada
- Access
- Dirt roads from Pioche or State highway 320
- Infrastructure
- Existing buildings, bunkhouse and warehouse
- Power
- Local power supply; three-phase power disconnected at the time of the technical report
- Water
- Potable and non-potable water from local districts
- Land position
- Over 1,606 acres
- Geology
- Stacked mineralized horizons in a faulted corridor
- Deposit type
- Bedded carbonate replacement deposit
- Mining method
- Historical underground mining of veins and mantos
- Ownership history
- Acquired through Stampede Metals Corporation
Exploration
Drill results
Every intercept the company has reported with numbers, as printed in its releases. Intervals are drilled widths unless the company states true widths.
| Hole | Target | From | To | Interval | Grade | Reported |
|---|---|---|---|---|---|---|
| PRC-45 | 27.43 m | 93.7 g/t Ag | Oct 6, 2026 | |||
| PRC-51 | Combined Metals Bed | 690 | 735 | 45 ft | 0.18 g/t Au · 77.60 g/t Ag · 5.29 % Mn · 2.16 % Zn · 0.71 % Pb | Oct 6, 2026 |
| PRC-51 | 690 | 695 | 5 ft | 0.10 g/t Au · 265.00 g/t Ag · 5.36 % Mn · 1.24 % Zn · 0.68 % Pb | Oct 6, 2026 | |
| PRC-51 | 695 | 705 | 10 ft | 0.07 g/t Au · 98.90 g/t Ag · 4.92 % Mn · 2.44 % Zn · 0.60 % Pb | Oct 6, 2026 | |
| PRC-51 | 705 | 715 | 10 ft | 0.06 g/t Au · 30.40 g/t Ag · 3.80 % Mn · 2.62 % Zn · 0.54 % Pb | Oct 6, 2026 | |
| PRC-51 | 715 | 720 | 5 ft | 0.53 g/t Au · 69.00 g/t Ag · 7.81 % Mn · 2.77 % Zn · 1.11 % Pb | Oct 6, 2026 | |
| PRC-51 | 720 | 735 | 15 ft | 0.24 g/t Au · 35.20 g/t Ag · 5.67 % Mn · 1.78 % Zn · 0.78 % Pb | Oct 6, 2026 | |
| PRC-51 | Pioche "D" Shale | 970 | 985 | 15 ft | 3.04 g/t Au · 83.30 g/t Ag · 0.26 % Mn · 2.32 % Zn · 0.30 % Pb | Oct 6, 2026 |
| PRC-51 | 970 | 975 | 5 ft | 0.39 g/t Au · 3.60 g/t Ag · 0.52 % Mn · 0.39 % Zn · 0.09 % Pb | Oct 6, 2026 | |
| PRC-51 | 975 | 980 | 5 ft | 7.97 g/t Au · 240.00 g/t Ag · 0.09 % Mn · 5.77 % Zn · 0.68 % Pb | Oct 6, 2026 | |
| PRC-51 | 980 | 985 | 5 ft | 0.76 g/t Au · 6.40 g/t Ag · 0.18 % Mn · 0.79 % Zn · 0.12 % Pb | Oct 6, 2026 | |
| PRC-52 | Combined Metals Bed | 650 | 655 | 5 ft | 0.02 g/t Au · 58.50 g/t Ag · 5.72 % Mn · 1.12 % Zn · 0.51 % Pb | Oct 6, 2026 |
| PRC-52 | Pioche "D" Shale | 840 | 845 | 5 ft | 3.24 g/t Au · 29.20 g/t Ag · 0.05 % Mn · 3.04 % Zn · 0.06 % Pb | Oct 6, 2026 |
| PRC-53 | Pioche "A" Shale | 710 | 720 | 10 ft | 0.08 g/t Au · 75.20 g/t Ag · 18.13 % Mn · 6.97 % Zn · 1.69 % Pb | Oct 6, 2026 |
| PRC-53 | Pioche Shale (Susan Duster) | 995 | 1005 | 10 ft | 0.02 g/t Au · 41.10 g/t Ag · 5.09 % Mn · 1.58 % Zn · 0.56 % Pb | Oct 6, 2026 |
| PRC-54 | Combined Metals Bed | 595 | 605 | 10 ft | 0.07 g/t Au · 77.10 g/t Ag · 9.89 % Mn · 1.82 % Zn · 0.63 % Pb | Oct 6, 2026 |
| PRC-54 | 595 | 600 | 5 ft | 0.12 g/t Au · 133.00 g/t Ag · 18.70 % Mn · 3.28 % Zn · 1.18 % Pb | Oct 6, 2026 | |
| PRC-54 | 600 | 605 | 5 ft | 0.01 g/t Au · 21.20 g/t Ag · 1.07 % Mn · 0.35 % Zn · 0.08 % Pb | Oct 6, 2026 | |
| PRC-54 | Pioche "D" Shale | 865 | 875 | 10 ft | 2.11 g/t Au · 619.60 g/t Ag · 0.10 % Mn · 3.66 % Zn · 0.15 % Pb | Oct 6, 2026 |
| PRC-54 | 865 | 870 | 5 ft | 4.16 g/t Au · 1,215.00 g/t Ag · 0.08 % Mn · 6.67 % Zn · 0.13 % Pb | Oct 6, 2026 |
Company plans
Milestones
The company's own stated plans and recent steps, each from the newest document that states it.
Coming up
Q1 2027
The company plans a maiden mineral resource estimate for the Prince Silver Project.
Done
Oct 6, 2026
The company reported drill results including PRC-59 and PRC-60, which intersected 47.24 metres at 68.17 g/t Ag and 36.58 metres at 86.30 g/t Ag, respectively.
As the company put it: “October 6, 2026”
May 19, 2026
The company announced further drill results and mobilization of a third drill rig.
Source Prince-Silver-MDA-April-30-2026 · page 6 · Jun 26, 2026
Jan 20, 2026
The company announced additional claims contiguous to Prince Silver, more than doubling its land position.
As the company put it: “January 20, 2026”
Source Prince-Silver-MDA-April-30-2026 · page 6 · Jun 26, 2026
Jan 13, 2026
The company announced assay results from the first holes of its ongoing drill program.
As the company put it: “January 13, 2026”
Source Prince-Silver-MDA-April-30-2026 · page 6 · Jun 26, 2026
1912
The Prince Silver Project recorded historical underground production.
As the company put it: “1912–1949”
Source Prince-Silver-October-2026-Full-Presentation-1-1 · page 5 · Oct 1, 2026
Companies behind the asset
Ownership & project roles
Owner
Source Prince-Silver-MDA-April-30-2026 · Jun 26, 2026
- Prince Silver Corp.+100% earnable
Option holder
Source Prince-Silver-MDA-April-30-2026 · Jun 26, 2026
Mining intelligence
Reported data
No resource, reserve or production figures have been reviewed for this project yet.