Preliminary economic assessment
Reported base-case project economics for the 2026 PEA.
- Post-tax NPV (5% discount rate)
- US$762.7M
- Post-tax IRR
- 41%
- Initial capital including closure deposit
- US$332.2M
- All-in sustaining cost
- US$18.74/oz Ag
What the market pays for this NPV
Kootenay Silver's market cap against the study's after-tax (5%) NPV.
- Market cap
- US$43.8M
- Study NPV
- US$763M
Whole company against the full project NPV, with no ownership adjustment. Share price 2026-11-20, FX 2026-11-20.
Base case pricesAg $50/ozAu $3,611/ozPb $0.91/lbZn $1.25/lbUS dollars, as used in the PEA
Production through the mine life
Payable metal by operating period, including reported ramp-up and partial years.
- Peak annual output
- 6.32 Moz Ag · operating period 1
- Operating periods shown
- 14 Includes reported ramp-up and partial years
Silver · Moz Ag per operating period
Operating period
View annual figures
| Operating period | Silver (Moz Ag) |
|---|---|
| 1 | 6.3212 |
| 2 | 5.2011 |
| 3 | 5.223 |
| 4 | 4.4809 |
| 5 | 4.5837 |
| 6 | 4.0223 |
| 7 | 4.3068 |
| 8 | 4.3624 |
| 9 | 4.5386 |
| 10 | 4.2408 |
| 11 | 4.0453 |
| 12 | 4.1882 |
| 13 | 3.8997 |
| 14 | 4.25 |
Annual payable metal production from the base-case cash-flow table, rather than gross metal produced.
Mine life & production
- Mine life
- 14 years
- LOM total payable silver production
- 63,663.9 koz
- LOM total payable gold production
- 27.3 koz
- LOM total payable lead production
- 45.3 Mlb
- LOM total payable zinc production
- 48.5 Mlb
- LOM EBITDA
- US$2,342M
- Operating cash cost
- US$16.85/oz Ag
Cash flow, capital & returns
- Post-tax payback period
- 1.9 years
- LOM pre-tax free cash flow
- US$1,896.9M
- LOM post-tax free cash flow
- US$1,165.9M
- LOM sustaining capital
- US$79.7M
- Pre-tax NPV (5% discount rate)
- US$1,264.9M
- Pre-tax IRR
- 55%
- Pre-tax payback period
- 1.7 years
Study assumptions, grades & recoveries
- LOM average silver head grade
- 78.7 g/t
- LOM average lead head grade
- 0.13%
- LOM average zinc head grade
- 0.18%
- LOM average gold head grade
- 0.06 g/t
- Silver price assumption
- US$50/oz
- Gold price assumption
- US$3,611/oz
- Lead price assumption
- US$0.91/lb
- Zinc price assumption
- US$1.25/lb
- Oxide silver recovery
- 88.3%
- Sulphide silver recovery
- 89.3%
- Oxide gold recovery
- 37.5%
- Sulphide gold recovery
- 61.8%
The economic analysis uses base-case silver, gold, lead and zinc prices and a 5.00% discount rate; all monetary values are reported in U.S. dollars.
PEA 2026 figures as reportedSource p. 256p. 21