La Cigarra

SilverMexico
  1. PEA
Total silver eq. resources
88.74 Moz
Measured & indicated 69.02 Moz · Inferred 19.72 Moz
After-tax NPV (5%)
US$762.7M
Pre-tax · US$1,264.9M

Kootenay Silver · Market cap / after-tax NPV: 5.7%

2026 study · reported base caseAg $50/oz · Au $3,611/oz · Pb $0.91/lb · Zn $1.25/lb
After-tax IRR
41%
Payback 1.9 years
Initial capital
US$332.2M
AISC US$18.74/oz Ag

The asset

Project overview

La Cigarra is a wholly owned Kootenay Silver project in Chihuahua, Mexico, near Hidalgo del Parral. It is reached by paved highway to Parral, then by gravel and dirt roads from Highway 24. Source 2

The deposit is interpreted as an intermediate-sulphidation epithermal silver system. Silver occurs in quartz veins, stockworks, silicified breccias and bedding-parallel zones. Kootenay's drilling discovered the RAM structure and a blind silver zone at Las Venadas. The updated estimate contains 60.02 million ounces of silver in measured and indicated resources and 17.25 million ounces in inferred resources. Source 2

Kootenay has filed a technical report supporting a preliminary economic assessment for an open-pit project. The assessment includes inferred resources, and there is no certainty its results will be realized. Kootenay planned a 10,000 meter Gap zone drill program with a Fall 2026 start date, as well as metallurgical optimization, environmental baseline work, permitting and hydrologic studies. Source 2 3

Loading map...

Silver-led project within the Parral Silver District in Mexico, located 20 km north of the Francisco del Oro–Santa Barbara camp.

Mine type
Open pit
Region
North America
Property area
4,033.32 ha
Location
Near Hidalgo del Parral, Chihuahua, Mexico
Access
Paved highway to Parral, then gravel and dirt roads from Highway 24
Infrastructure
No permanent mining or processing infrastructure on the property
Power
PEA expects grid power through a new transmission connection
Water
PEA expects fresh water from deep wells in the San Felipe de Jesus aquifer
Land position
16 mineral concessions covering 4,033.32 ha
Permits
Active permit for low-impact exploration work
Geology
Silver-bearing veins, stockworks, breccias and bedding-parallel zones
Deposit type
Interpreted intermediate-sulphidation epithermal system
Mining method
PEA proposes open-pit truck-and-shovel mining
Processing
PEA proposes leaching and flotation for doré and concentrates
Ownership history
Acquired through Northair Silver Corp. in 2016

Company plans

Milestones

The company's own stated steps and plans, earliest first, each from the newest document that states it.

  1. Apr 2016

    Kootenay acquired La Cigarra from Northair Silver.

    Source

  2. Jan 25, 2024

    Kootenay announced an updated mineral resource estimate.

    Source

  3. Jun 2026

    Kootenay announced a preliminary economic assessment.

    Source

  4. Today

    Aug 2026

    Kootenay filed the technical report for the preliminary economic assessment.

    Source

  5. Fall 2026

    The company plans expansion drilling for fall 2026.

    Source

Mineral inventory

Resources and reserves

How this data is collected

Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.

Mineral resources as at Apr 4, 2026NI 43-101
Total silver eq.
88.74Moz AgEq
Measured & indicated + Inferred
Measured & indicated
69.02Moz AgEq
78% of the total
Inferred
19.72Moz AgEq
22% of the total
Market cap per resource ounce
US$0.49/ oz AgEq
All categories

Reported estimate. The total combines categories of different confidence; inferred resources are not reserves. Source

How market cap per ounce is calculated

Kootenay Silver · US$43.8M market cap

All categories US$0.49 / oz AgEq · Measured & indicated US$0.63 / oz AgEq · Inferred US$2.22 / oz AgEq

Each figure divides the whole company market cap by that category's reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-11-20 · FX 2026-11-20.

CategoryTonnageMtGradeContained metalCut-off
Silverg/tGoldg/tLead%Zinc%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbSilver eq.Moz
Measured2.93840.060.140.19967.875.69.112.49.01—
Indicated20.09810.060.140.199352.1439.662.284.660.01—
Measured & indicatedsubtotal23.02810.060.140.199360.0245.271.39769.02—
Inferred6.78790.050.150.179017.2511.922.725.519.72—
TotalMeasured & indicated + Inferred29.880.54*0.06*0.14*0.19*92.32*77.2757.194122.588.74

The total adds Measured & indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.

Shaded columns are equivalent figures. An equivalent column combines the metals beside it on the company's own price assumptions. It is not additional metal and must not be added to them.

The development case

Project economics

Company-reported study estimates, modelled under the assumptions below. These are not actual operating results.

PEA · 2026

Preliminary economic assessment

Reported base-case project economics for the 2026 PEA.

Post-tax NPV (5% discount rate)
US$762.7M
Post-tax IRR
41%
Initial capital including closure deposit
US$332.2M
All-in sustaining cost
US$18.74/oz Ag

What the market pays for this NPV

Kootenay Silver's market cap against the study's after-tax (5%) NPV.

Market cap
US$43.8M
Study NPV
US$763M

Whole company against the full project NPV, with no ownership adjustment. Share price 2026-11-20, FX 2026-11-20.

Base case pricesAg $50/ozAu $3,611/ozPb $0.91/lbZn $1.25/lbUS dollars, as used in the PEA

Production through the mine life

Payable metal by operating period, including reported ramp-up and partial years.

Peak annual output
6.32 Moz Ag · operating period 1
Operating periods shown
14 Includes reported ramp-up and partial years

Silver · Moz Ag per operating period

Operating period

View annual figures
Reported Silver annual production
Operating periodSilver (Moz Ag)
16.3212
25.2011
35.223
44.4809
54.5837
64.0223
74.3068
84.3624
94.5386
104.2408
114.0453
124.1882
133.8997
144.25

Annual payable metal production from the base-case cash-flow table, rather than gross metal produced.

Source

Mine life & production

Mine life
14 years
LOM total payable silver production
63,663.9 koz
LOM total payable gold production
27.3 koz
LOM total payable lead production
45.3 Mlb
LOM total payable zinc production
48.5 Mlb
LOM EBITDA
US$2,342M
Operating cash cost
US$16.85/oz Ag

Cash flow, capital & returns

Post-tax payback period
1.9 years
LOM pre-tax free cash flow
US$1,896.9M
LOM post-tax free cash flow
US$1,165.9M
LOM sustaining capital
US$79.7M
Pre-tax NPV (5% discount rate)
US$1,264.9M
Pre-tax IRR
55%
Pre-tax payback period
1.7 years
Study assumptions, grades & recoveries
LOM average silver head grade
78.7 g/t
LOM average lead head grade
0.13%
LOM average zinc head grade
0.18%
LOM average gold head grade
0.06 g/t
Silver price assumption
US$50/oz
Gold price assumption
US$3,611/oz
Lead price assumption
US$0.91/lb
Zinc price assumption
US$1.25/lb
Oxide silver recovery
88.3%
Sulphide silver recovery
89.3%
Oxide gold recovery
37.5%
Sulphide gold recovery
61.8%

The economic analysis uses base-case silver, gold, lead and zinc prices and a 5.00% discount rate; all monetary values are reported in U.S. dollars.

PEA 2026 figures as reportedSource p. 256p. 21

Companies behind the asset

Ownership & project roles

100% owned by Kootenay SilverOwner Source

Copyrights © 2026 Social Tech Nova AB

Disclaimer: Information on GoldSilverAI is for educational purposes only and is not intended as financial advice. Consult a professional advisor before making investment decisions.