Mining projects

Mining intelligence · Project

La Cigarra

PEASilverMexico
Total silver eq. resources
88.74 Moz
Measured & indicated · 69.02 MozInferred · 19.72 MozLa Cigarra Deposit in-pit Mineral Resource, including oxide and sulphide mineralization, constrained by continuous 3-D wireframe models and a constraining pit shell
After-tax NPV (5%)
762.7 US$M
Pre-tax · 1,264.9 US$M

Kootenay Silver · Market cap / after-tax NPV: 11.5%

2026 study · reported base caseAg $50/oz · Au $3,611/oz · Pb $0.91/lb · Zn $1.25/lb
Property area
4,033.32 ha
Reported land area
Linked companies
1
Ownership and project roles

The asset

Project overview

Silver-led project within the Parral Silver District in Mexico, located 20 km north of the Francisco del Oro–Santa Barbara camp. It has a 2026 mineral resource estimate and a positive preliminary economic assessment, with open-pit mining contemplated.

Mine type
Open pit
Region
North America
Property area
4,033.32 ha
Mexico
Loading map...

Silver-led project within the Parral Silver District in Mexico, located 20 km north of the Francisco del Oro–Santa Barbara camp.

Companies behind the asset

Ownership & project roles

Mineral inventory

Resources and reserves

How this data is collected

Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.

Oxide & sulphide · mineral resources as at Apr 4, 2026NI 43-101
Total silver eq.
88.74Moz AgEq

Measured & indicated + Inferred

Measured & indicated
69.02Moz AgEq
Inferred
19.72Moz AgEq

La Cigarra Deposit in-pit Mineral Resource, including oxide and sulphide mineralization, constrained by continuous 3-D wireframe models and a constraining pit shell. Total combines resource categories with different confidence levels; inferred resources are not reserves.

Source La Cigarra 43-101 Pre Economic Assessment (14.33 MB) · PDF page 162 · Jul 21, 2026

Market cap per resource ounce

Kootenay Silver · US$87.9M market cap

All categories
US$0.99/ oz AgEq
Measured & indicated
US$1.27/ oz AgEq
Inferred
US$4.46/ oz AgEq

Each figure divides the whole company market cap by that category’s reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-09-21 · FX 2026-09-22.

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbSilver eq.Moz
Measured2.93840.060.140.19967.875.69.112.49.01
Indicated20.09810.060.140.199352.1439.662.284.660.01
Measured & indicatedsubtotal23.02810.060.140.199360.0245.271.39769.02
Inferred6.78790.050.150.179017.2511.922.725.519.72

Cut-off 30 g/t

Shaded columns are equivalent figures. An equivalent column combines the metals beside it on the company's own price assumptions. It is not additional metal and must not be added to them.

The development case

Project economics

Company-reported study estimates, modelled under the assumptions below. These are not actual operating results.

PEA · 2026

Preliminary economic assessment

Reported base-case project economics for the 2026 PEA.

Post-tax NPV (5% discount rate)
762.7US$M
Post-tax IRR
41%
Initial capital including closure deposit
332.2US$M
All-in sustaining cost
18.74US$/oz Ag

Market cap / after-tax (5%) NPV

11.5%Kootenay Silverof after-tax (5%) project NPV

Market cap US$87.9M · NPV US$762.7M · Share price 2026-09-21 · FX 2026-09-22. Whole company compared with the full project NPV; no ownership adjustment.

Metal prices the company used in this PEA

Silver
$50/oz
Gold
$3,611/oz
Lead
$0.91/lb
Zinc
$1.25/lb

All prices in US dollars.

Production through the mine life

Payable metal by operating period, including reported ramp-up and partial years.

Peak annual output
6.32

Moz Ag · operating period 1

Operating periods shown
14

Includes reported ramp-up and partial years

Silver · Moz Ag per operating period

Operating period

View annual figures
Reported Silver annual production
Operating periodSilver (Moz Ag)
16.3212
25.2011
35.223
44.4809
54.5837
64.0223
74.3068
84.3624
94.5386
104.2408
114.0453
124.1882
133.8997
144.25

Annual payable metal production from the base-case cash-flow table, rather than gross metal produced.

Source La Cigarra 43-101 Pre Economic Assessment (14.33 MB) · PDF page 261 · Jul 21, 2026

Mine life & production

Mine life
14 years
LOM total payable silver production
63,663.9 koz
LOM total payable gold production
27.3 koz
LOM total payable lead production
45.3 Mlb
LOM total payable zinc production
48.5 Mlb
Operating cash cost
16.85 US$/oz Ag
LOM EBITDA
2,342 US$M

Cash flow, capital & returns

Post-tax payback period
1.9 years
LOM pre-tax free cash flow
1,896.9 US$M
LOM post-tax free cash flow
1,165.9 US$M
LOM sustaining capital
79.7 US$M
Pre-tax NPV (5% discount rate)
1,264.9 US$M
Pre-tax IRR
55 %
Pre-tax payback period
1.7 years
Study assumptions, grades & recoveries
Silver price assumption
50 US$/oz
Gold price assumption
3,611 US$/oz
Lead price assumption
0.91 US$/lb
Zinc price assumption
1.25 US$/lb
LOM average silver head grade
78.7 g/t
LOM average lead head grade
0.13 %
LOM average zinc head grade
0.18 %
LOM average gold head grade
0.06 g/t
Oxide silver recovery
88.3 %
Sulphide silver recovery
89.3 %
Oxide gold recovery
37.5 %
Sulphide gold recovery
61.8 %

The economic analysis uses base-case silver, gold, lead and zinc prices and a 5.00% discount rate; all monetary values are reported in U.S. dollars.