Mining intelligence · Project
Hercules Project
- Advanced Exploration
- Resource
- PEA
- PFS
- Feasibility
- Permitting
- Construction
- Production
The asset
Project overview
The Hercules Project is northwest of Cambridge, Idaho. The company reports road access to all drilling sites and a state highway within 1km of the deposit. Source 2
Hercules discovered the Leviathan copper porphyry beneath an epithermal silver system in 2023. Drilling has traced Leviathan mineralization over 1.35 km in strike, up to 750 m in width and approximately 500 m vertically. The silver system includes an intersection of 139 g/t Ag over 42m. Source 2
At Southern Flats, drilling extended copper porphyry mineralization, with HER-26-01 returning 287 m of 0.58% CuEq. At Hook, reconnaissance drilling encountered alteration consistent with the margins of a potential porphyry system. The company reports that two drills are expanding Leviathan and is planning its 2027 drill program. Source 2 3
- Region
- North America
- Location
- Northwest of Cambridge, Idaho
- Access
- Road access to all drilling sites; state highway within 1km of the deposit
- Infrastructure
- Rail within 30 km of site
- Power
- Three 260 kV transmission lines through the property
- Water
- Onsite water access
- Land position
- >100,000 acres of private, state and federal mineral rights
- Permits
- Drill permitting not required on the Leviathan discovery
- Geology
- Epithermal silver system overlying Leviathan and extending over Southern Flats
- Deposit type
- Copper porphyry with an overlying epithermal silver system
- Ownership history
- Acquired by Hercules in 2021
Exploration
Drill results
- Reported intercepts
- 231
- 78 holes · 23 releases
- Best grade × width (Cu)
- 339 %·m
- HER-25-18: 787.91 m @ 0.4 %
- Longest interval
- 801.62 m
- HER-25-21
- Highest grade (Cu)
- 12.52 %
- HER-25-17 over 6.10 m
1HER-25-18Leviathan Porphyry · from 172.21 m
787.91 m0.43 % Cu339 %·mJun 16, 2026
2HER-25-18Leviathan · from 172.21 m
670.44 m0.45 % Cu302 %·mMar 30, 2026
3HER-25-15from 300.23 m
463.29 m0.56 % Cu259 %·mFeb 4, 2026
4HER-25-15from 300.23 m
420.62 m0.60 % Cu252 %·mFeb 4, 2026
5HER-25-15Leviathan
420.62 m0.60 % Cu252 %·mMar 30, 2026
6HER-25-21Leviathan Porphyry · from 224.03 m
801.62 m0.30 % Cu241 %·mJun 16, 2026
7HER-25-02Leviathan · from 434.34 m
385.9 m0.61 % Cu235 %·mSep 17, 2025
8HER-25-02Leviathan · from 440.44 m
345.9 m0.66 % Cu228 %·mSep 17, 2025
9HER-25-17from 321.56 m
585.22 m0.39 % Cu228 %·mFeb 4, 2026
10HER-24-08
480 m0.47 % Cu226 %·mNov 19, 2024
11HER-24-08from 242.32 m
479.55 m0.47 % Cu225 %·mOct 10, 2024
12HER-25-05from 131.06 m
379.45 m0.50 % Cu190 %·mOct 22, 2025
How to read this
Every intercept the company has reported with numbers, as printed in its releases. A bar's length is grade × width and a darker bar is a higher reported Cu grade. Grade × width multiplies a row's own reported interval and grade (gram metres for g/t, percent metres for %); it is a product of reported figures, not a company figure, and is only formed for intervals in metres. Intervals are drilled widths unless the company states true widths, and an "including" interval is part of the one above it, not additional.
Company plans
Milestones
The company's own stated steps and plans, earliest first, each from the newest document that states it.
2021
Hercules acquired the Hercules Property.
Oct 10, 2023
Hercules confirmed the Leviathan copper porphyry discovery.
Apr 17, 2025
Hercules completed its first 3D block model of Leviathan.
Aug 18, 2025
Hercules completed the closing of a strategic option agreement with Barrick over claims surrounding Hercules.
2025
Hercules identified an epithermal silver-lead-zinc centre at Southern Flats.
Mar 20, 2026
The company's subsidiary entered a lease with an option to purchase private land adjoining Hercules.
- Today
2026
Drilling resumed at Southern Flats, where HER-25-25 intersected copper-equivalent mineralization.
Plannedstated Oct 2026
2 drills expanding Leviathan porphyry, drilling at 200 m spacings.
Mining intelligence
Reported data
No resource, reserve or production figures have been reviewed for this project yet.
Companies behind the asset
Ownership & project roles
100% owned by Hercules Metals CorpOwner Source