Mining intelligence · Project
Challacollo
- Exploration
- Resource
- PEA
- PFS
- Feasibility
- Permitting
- Construction
- Production
- Total silver resources
- 46.29 Moz
The asset
Project overview
Challacollo is a silver-gold project in Region I, northern Chile. It is reached from the Pan American Highway via the Quebrada Blanca mine access road, followed by a gravel road. Source 2
The company describes Challacollo as a low-sulphidation epithermal silver-gold deposit. Mineralized structures cut the Challacollo Volcanic Complex, and Lolón is a silicified breccia structure. The mineral resource estimate reports 6,640 Kt indicated at 165 g/t silver and 0.27 g/t gold, and 2,803 Kt inferred at 124 g/t silver and 0.17 g/t gold. Mineral resources that are not reserves have no demonstrated economic viability. Source 2 3
Aftermath reported drilling 5 holes for a total of 813m at Challacollo. The drilling targeted extensions of known veins and potential new vein intercepts. The company expected assays in Q4 2026 and anticipated additional drilling contingent on assays from the first 6 holes. Source 2
Centre of the Challacollo Property -20.9528, -69.3556
- Mine type
- Open Pit and Underground
- Location
- Region I, northern Chile
- Access
- Quebrada Blanca mine access road, then gravel road
- Power
- Power transmission lines 15-30 km from the property
- Water
- Groundwater rights for 12 l/sec at Tamentica
- Permits
- Activities initiated under an approved environmental instrument
- Geology
- Lolón, Gladys and Lucy mineralized fault structures
- Deposit type
- Low-sulphidation epithermal silver-gold vein deposit
- Processing
- Testwork identified direct agitated cyanide leaching as the preferred extraction method
- Ownership history
- 100% acquired from Mandalay Resources
Company plans
Milestones
The company's own stated steps and plans, earliest first, each from the newest document that states it.
Feb 5, 2021
A technical report on the Challacollo mineral resource estimate was dated.
Aug 11, 2022
Aftermath completed its acquisition of Challacollo.
- Today
Jul 22, 2026
Aftermath reported that a limited drill program was underway at Challacollo.
Plannedstated Nov 2026
The company expects drilling results from the Challacollo silver deposit in Chile.
Mineral inventory
Resources and reserves
Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.
Mineral resources as at Nov 30, 2020Standard not stated
- Total silver
- 46.29Moz silver
- Indicated + Inferred
- Indicated
- 35.15Moz silver
- 76% of the total
- Inferred
- 11.14Moz silver
- 24% of the total
- Market cap per resource ounce
- US$2.14/ oz silver
- All categories
Reported estimate. The total combines categories of different confidence; inferred resources are not reserves. Source
How market cap per ounce is calculated
Aftermath Silver Ltd · US$98.9M market cap
All categories US$2.14 / oz silver · Indicated US$2.81 / oz silver · Inferred US$8.88 / oz silver
Each figure divides the whole company market cap by that category's reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-11-20 · FX 2026-11-20.
Indicative silver equivalent
GoldSilver calculation, not company-reportedPrice-based illustration from the company’s reported contained metals. Assumes 100% recovery and payability for every metal and excludes mining costs. Loading latest available metal prices….
Metal prices & calculation
AgEq ounces = silver ounces + each other metal’s contained amount × its price ÷ the silver price. Ounces and pounds are matched to the price units shown. This is gross in-situ metal value expressed as silver, not a recoverable resource estimate. Company-reported AgEq totals exclude this illustration.
Total
| Category | TonnageMt | Grade | Contained metal | Cut-off | ||
|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | SilverMoz | Goldkoz | |||
| Indicated | 6.64 | 165 | 0.27 | 35.15 | 58 | — |
| Inferred | 2.8 | 124 | 0.17 | 11.14 | 15 | — |
| TotalIndicated + Inferred | 9.44 | 152.83* | 0.24* | 46.29 | 73 | |
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Breakdown by deposit (2): restates the totals above, not additional to them
Open Pit
| Category | TonnageMt | Grade | Contained metal | Cut-off | ||
|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | SilverMoz | Goldkoz | |||
| Indicated | 5.6 | 170 | 0.27 | 30.64 | 49 | — |
| Inferred | 2.36 | 117 | 0.15 | 8.91 | 11 | — |
| TotalIndicated + Inferred | 7.96 | 154.28* | 0.23* | 39.55 | 60 | |
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Underground
| Category | TonnageMt | Grade | Contained metal | Cut-off | ||
|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | SilverMoz | Goldkoz | |||
| Indicated | 1.04 | 134 | 0.29 | 4.51 | 10 | — |
| Inferred | 0.443 | 157 | 0.26 | 2.23 | 4 | — |
| TotalIndicated + Inferred | 1.49 | 140.86* | 0.28* | 6.74 | 14 | |
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Companies behind the asset
Ownership & project roles
100% owned by Aftermath Silver LtdOwner Source