Mining projects

Mining intelligence · Project

Cerro Las Minitas

PermittingSilverMexico
OperatorSouthern Silver Exploration Corp
Total silver eq. resources
302.51 Moz
Indicated · 116.13 MozInferred · 186.38 MozCerro Las Minitas sulphide mineral resource estimate
After-tax NPV (5%)
501 US$M
Pre-tax · 888 US$M

Southern Silver Exploration Corp · Market cap / after-tax NPV: 34.6%

2024 study · reported base caseAg $23/oz · Au $1,850/oz · Cu $4/lb · Pb $1/lb · Zn $1.25/lb
Property area
27,451 ha
Reported land area
Linked companies
1
Ownership and project roles

The asset

Project overview

Silver-enriched Ag-Cu-Pb-Zn skarn/CRD project in Durango, Mexico. The project has a 2024 PEA, ongoing permitting and baseline studies, and is planned as an underground mine; the Puro Corazón claim is being consolidated into the project.

Mine type
Underground
Region
North America
Property area
27,451 ha
Mexico
Loading map...

The Cerro Las Minitas Project is an exploration and resource development project located in Mexico, 70 km northeast of the City of Durango, capital of the state of Durango, and 6 km northwest of the town of Guadalupe Victoria, in the municipality of Guadalupe Victoria, Durango.

Companies behind the asset

Ownership & project roles

Mineral inventory

Resources and reserves

How this data is collected

Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.

Sulphide · mineral resources as at Mar 20, 2024NI 43-101
Total silver eq.
302.51Moz AgEq

Indicated + Inferred

Indicated
116.13Moz AgEq
Inferred
186.38Moz AgEq

Cerro Las Minitas sulphide mineral resource estimate. Total combines resource categories with different confidence levels; inferred resources are not reserves.

Source ssv corporate presentation sep 2026 · PDF page 12 · Sep 1, 2026

Market cap per resource ounce

Southern Silver Exploration Corp · US$173.5M market cap

All categories
US$0.57/ oz AgEq
Indicated
US$1.49/ oz AgEq
Inferred
US$0.93/ oz AgEq

Each figure divides the whole company market cap by that category’s reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-09-21 · FX 2026-09-22.

Whole property

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Indicated13.31020.071.33.10.1727243.453237492149116.13
Inferred23.431110.141.12.10.2124783.361045821,106111186.38

Cut-off 60 US$/t

Breakdown by deposit (6) — restates the totals above, not additional to them

Blind Zone

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Indicated2.61920.041.820.12277.754106116619.11
Inferred1.7740.21.21.80.081924.03114666310.46

Cut-off 60 US$/t

El Sol Zone

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Indicated1.25770.042.11.90.082143.12575428.6
Inferred1.17570.031.72.10.061852.151435316.96

Cut-off 60 US$/t

La Bocona/North Felsite Zone

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Indicated1.811210.192.11.50.232627.04118259915.24
Inferred2.671200.221.41.60.1324310.33198595720.86

Cut-off 60 US$/t

Las Victorias Zone

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Inferred1.421240.651.92.20.123075.63305869414

Cut-off 60 US$/t

Skarn Front Zone

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Indicated7.631040.060.84.10.1929825.56151286923273.18
Inferred12.441100.050.72.60.3225443.832018071188101.62

Cut-off 60 US$/t

South Skarn Zone

CategoryTonnageMtGradeContained metal
Silverg/tGoldg/tLead%Zinc%Copper%Silver eq.g/tSilverMozGoldkozLeadMlbZincMlbCopperMlbSilver eq.Moz
Inferred4.041340.191.91.30.0825017.3924170112732.48

Cut-off 60 US$/t

Oxide · mineral resources as at Mar 20, 2024NI 43-101

La Bocona Oxide mineral resource estimate at a US$60/t NSR cut-off · Oxide mineral resource estimate; base metals were not recovered in the leach circuit and gold recovery was estimated at 70%

CategoryTonnagektGrade
Silverg/tGoldg/t
InferredTable 1-3139111.611.37

Cut-off 60 US$/t

Source Cerro Las Minitas NI 43-101 Technical Report and PEA (2024) · PDF page 28 · Jun 4, 2024

Shaded columns are equivalent figures. An equivalent column combines the metals beside it on the company's own price assumptions. It is not additional metal and must not be added to them.

The development case

Project economics

Company-reported study estimates, modelled under the assumptions below. These are not actual operating results.

PEA · 2024

Preliminary economic assessment

Reported project economics for the 2024 PEA.

After-tax NPV (5% discount rate)
501US$M
After-tax IRR
21.2%
Initial capex
388US$M
LOM average AISC
13.23US$/ozAgEq

Market cap / after-tax (5%) NPV

34.6%Southern Silver Exploration Corpof after-tax (5%) project NPV

Market cap US$173.5M · NPV US$501M · Share price 2026-09-21 · FX 2026-09-22. Whole company compared with the full project NPV; no ownership adjustment.

Metal prices the company used in this PEA

Silver
$23/oz
Gold
$1,850/oz
Copper
$4/lb
Lead
$1/lb
Zinc
$1.25/lb

All prices in US dollars.

Production through the mine life

Payable metal by operating period, including reported ramp-up and partial years.

Years 1-8 average annual production
14.4

Moz AgEq / year · reported average

LOM average annual production
11.4

Moz AgEq / year · reported average

Peak annual output
17.97

Moz AgEq · operating period 6

Source Annual averages: Presentation · PDF page 13 · Sep 1, 2026

AgEq · Moz AgEq per operating period

Operating period

Equivalent metal combines the metals under the study’s price assumptions. It is not additional physical production.

View annual figures
Reported AgEq annual production
Operating periodAgEq (Moz AgEq)
111.959
212.806
314.729
416.133
515.471
617.965
714.646
811.682
910.658
1011.209
1111.521
1211.231
1311.017
149.201
157.362
163.839
172.765
180.137

Annual values are payable metal, not produced or recovered metal; AgEq is reported separately from the physical metals, with Year 18 being the partial final operating year.

Source Cerro Las Minitas NI 43-101 Technical Report and PEA (2024) · PDF page 312 · Jun 4, 2024

Mine life & production

Mine life
17+ years
LOM average annual production
11.4 MozAgEq
Years 1-8 average annual production
14.4 MozAgEq
Nominal throughput
5,300 tpd
Modelled LOM production
29.5 Mt

Cash flow, capital & returns

Average after-tax annual FCF during production years
78 US$M
LOM sustaining capex
160 US$M
Pre-tax NPV (5% discount rate)
888 US$M
Pre-tax IRR
30 %
Study assumptions, grades & recoveries
Average silver head grade
104.1 g/t
Average AgEq head grade
256.8 g/t
Average silver recovery
93.3 %
Modelled LOM gold head grade
0.11 g/t Au
Modelled LOM copper head grade
0.19 % Cu
Modelled LOM lead head grade
1.06 % Pb
Modelled LOM zinc head grade
2.41 % Zn
Average NSR
131 $US/t

LOM Ag/Au/Cu/Pb/Zn sales are shown on an AgEq basis using Ag = $23.00/oz, Au = $1850/oz, Cu = $4.00/lb, Pb = $1.00/lb and Zn = $1.25/lb. Average silver recovery is 93.30%. AISC is reported on a co-byproduct basis using AgEq.

Source Presentation · PDF page 13 · Sep 1, 2026

Copyrights © 2026 Social Tech Nova AB

Disclaimer: Information on GoldSilverAI is for educational purposes only and is not intended as financial advice. Consult a professional advisor before making investment decisions.