Cerro Las Minitas

PermittingSilverMexico
After-tax NPV (5%)
501 US$M
Pre-tax · 888 US$M

Market cap / NPV unavailable: a recent share price, shares outstanding and matching exchange rate are required.

2024 study · reported base caseAg $23/oz · Au $1,850/oz · Cu $4/lb · Pb $1/lb · Zn $1.25/lb
Property area
27,451 ha
Reported land area

The asset

Project overview

Silver-enriched Ag-Cu-Pb-Zn skarn/CRD project in Durango, Mexico. The project has a 2024 PEA, ongoing permitting and baseline studies, and is planned as an underground mine; the Puro Corazón claim is being consolidated into the project.

Mine type
Underground
Region
North America
Property area
27,451 ha
Mexico
Loading map...

Companies behind the asset

Ownership & project roles

No reviewed ownership information yet.

The development case

Project economics

Company-reported study estimates, modelled under the assumptions below. These are not actual operating results.

PEA · 2024

Preliminary economic assessment

Reported project economics for the 2024 PEA.

After-tax NPV (5% discount rate)
501US$M
After-tax IRR
21.2%
Initial capex
388US$M
LOM average AISC
13.23US$/ozAgEq

Market cap / NPV unavailable: a recent share price, shares outstanding and matching exchange rate are required.

Metal prices the company used in this PEA

Silver
$23/oz
Gold
$1,850/oz
Copper
$4/lb
Lead
$1/lb
Zinc
$1.25/lb

All prices in US dollars.

Production through the mine life

Payable metal by operating period, including reported ramp-up and partial years.

Years 1-8 average annual production
14.4

Moz AgEq / year · reported average

LOM average annual production
11.4

Moz AgEq / year · reported average

Peak annual output
17.97

Moz AgEq · operating period 6

Source Annual averages: Presentation · PDF page 13 · Sep 1, 2026

AgEq · Moz AgEq per operating period

Operating period

Equivalent metal combines the metals under the study’s price assumptions. It is not additional physical production.

View annual figures
Reported AgEq annual production
Operating periodAgEq (Moz AgEq)
111.959
212.806
314.729
416.133
515.471
617.965
714.646
811.682
910.658
1011.209
1111.521
1211.231
1311.017
149.201
157.362
163.839
172.765
180.137

Annual values are payable metal, not produced or recovered metal; AgEq is reported separately from the physical metals, with Year 18 being the partial final operating year.

Source Cerro Las Minitas NI 43-101 Technical Report and PEA (2024) · PDF page 312 · Jun 4, 2024

Mine life & production

Mine life
17+ years
LOM average annual production
11.4 MozAgEq
Years 1-8 average annual production
14.4 MozAgEq
Nominal throughput
5,300 tpd
Modelled LOM production
29.5 Mt

Cash flow, capital & returns

Average after-tax annual FCF during production years
78 US$M
LOM sustaining capex
160 US$M
Pre-tax NPV (5% discount rate)
888 US$M
Pre-tax IRR
30 %
Study assumptions, grades & recoveries
Average silver head grade
104.1 g/t
Average AgEq head grade
256.8 g/t
Average silver recovery
93.3 %
Modelled LOM gold head grade
0.11 g/t Au
Modelled LOM copper head grade
0.19 % Cu
Modelled LOM lead head grade
1.06 % Pb
Modelled LOM zinc head grade
2.41 % Zn
Average NSR
131 $US/t

LOM Ag/Au/Cu/Pb/Zn sales are shown on an AgEq basis using Ag = $23.00/oz, Au = $1850/oz, Cu = $4.00/lb, Pb = $1.00/lb and Zn = $1.25/lb. Average silver recovery is 93.30%. AISC is reported on a co-byproduct basis using AgEq.

Source Presentation · PDF page 13 · Sep 1, 2026

Mining intelligence

Reported data

How this data is collected

No resource, reserve or production figures have been reviewed for this project yet.