Mining intelligence · Project
Cachinal
- Exploration
- Resource
- PEA
- PFS
- Feasibility
- Permitting
- Construction
- Production
- Total silver resources
- 18.8 Moz
The asset
Project overview
Cachinal is in Chile’s Antofagasta Region, about 40 km east of the Pan American Highway. Access from the highway is along a sand and gravel road. Aftermath reported owning a 100% interest in the project. Source 2 3
Aftermath’s latest presentation describes Cachinal as an intermediate-sulphidation epithermal silver-gold system hosted in a shear zone. The known veins lie within and near the western margin of the Cachinal volcanic caldera. The technical report describes a network of steeply dipping, north- to northwest-trending quartz veins. Source 2
Aftermath reviewed historical drilling, geochemical and geophysical data. The mineral resource estimate, effective August 10, 2020, includes 5.05 Mt at 101 g/t silver in the indicated category and 0.53 Mt at 145 g/t silver in the inferred category. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The company’s environmental instrument for drilling was approved on 15th July 2026; Aftermath plans to focus its initial drilling on high-grade shoots at depth. Source 2
Centre of the Cachinal property -24.9716, -69.5333
- Mine type
- Open Pit and Underground
- Location
- Antofagasta Region, Chile, about 40 km east of the Pan American Highway
- Access
- Sand and gravel road from the Pan American Highway
- Infrastructure
- Secondary tracks across the project area
- Land position
- Reported as sixteen mining concessions covering approximately 4,867 hectares
- Geology
- Steeply dipping, north- to northwest-trending quartz veins
- Deposit type
- Intermediate-sulphidation epithermal, shear-zone hosted
- Mining method
- Open pit and underground scenarios for resource reporting
- Ownership history
- Aftermath reported a 100% interest
Company plans
Milestones
The company's own stated steps and plans, earliest first, each from the newest document that states it.
Mineral inventory
Resources and reserves
Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.
Mineral resources as at Aug 10, 2020Standard not stated
- Total silver
- 18.8Moz silver
- Indicated + Inferred
- Indicated
- 16.32Moz silver
- 87% of the total
- Inferred
- 2.48Moz silver
- 13% of the total
- Market cap per resource ounce
- US$5.26/ oz silver
- All categories
Reported estimate. The total combines categories of different confidence; inferred resources are not reserves. Source
How market cap per ounce is calculated
Aftermath Silver Ltd · US$98.9M market cap
All categories US$5.26 / oz silver · Indicated US$6.06 / oz silver · Inferred US$39.89 / oz silver
Each figure divides the whole company market cap by that category's reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-11-20 · FX 2026-11-20.
Indicative silver equivalent
GoldSilver calculation, not company-reportedPrice-based illustration from the company’s reported contained metals. Assumes 100% recovery and payability for every metal and excludes mining costs. Loading latest available metal prices….
Metal prices & calculation
AgEq ounces = silver ounces + each other metal’s contained amount × its price ÷ the silver price. Ounces and pounds are matched to the price units shown. This is gross in-situ metal value expressed as silver, not a recoverable resource estimate. Company-reported AgEq totals exclude this illustration.
Total
| Category | TonnageMt | Grade | Contained metal | Cut-off | ||
|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | SilverMoz | Goldkoz | |||
| Indicated | 5.05 | 101 | 0.13 | 16.32 | 21.7 | — |
| Inferred | 0.53 | 145 | 0.15 | 2.48 | 2.61 | — |
| TotalIndicated + Inferred | 5.58 | 105.18* | 0.13* | 18.8 | 24.31 | |
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Breakdown by deposit (2): restates the totals above, not additional to them
Open Pit
| Category | TonnageMt | Grade | Contained metal | Cut-off | ||
|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | SilverMoz | Goldkoz | |||
| Indicated | 4.83 | 97 | 0.13 | 15.03 | 20.05 | — |
| Inferred | 0.17 | 73 | 0.07 | 0.41 | 0.43 | — |
| TotalIndicated + Inferred | 5 | 96.18* | 0.13* | 15.44 | 20.48 | |
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Underground
| Category | Tonnagekt | Grade | Contained metal | Cut-off | ||
|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | SilverMoz | Goldkoz | |||
| Indicated | 220 | 182 | 0.22 | 1.29 | 1.65 | — |
| Inferred | 360 | 180 | 0.19 | 2.07 | 2.18 | — |
| TotalIndicated + Inferred | 580 | 180.76* | 0.2* | 3.36 | 3.83 | |
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Companies behind the asset
Ownership & project roles
100% owned by Aftermath Silver LtdOwner Source