Mining intelligence · Project
Bethania Silver Project
- Exploration
- Resource
- PEA
- PFS
- Feasibility
- Permitting
- Construction
- Production
- Total silver eq. resources
- 14.39 Moz
- Quarterly silver eq. processed
- 16,055 oz
- Annual silver processed
- 34,155 oz
- Property area
- 5,600 ha
The asset
Project overview
Bethania is in Huancavelica, central Peru, and the mine is reached by road from Huancayo. The resource area contains structurally controlled silver-polymetallic veins. Source 2 3
Kuya restarted the mine in 2024. More recently, underground development exposed a segment of the Española vein up to 1.1 metres in true width. A blended batch containing material from that segment averaged 10 oz/t silver and achieved 91% silver recovery, but Kuya cautioned that it was not necessarily representative of the overall operation. Source 2
In Q3 2026, Kuya prioritized underground development over near-term production and mined 3,401 tonnes of mineralized material. Underground drilling restarted in late September. Kuya uses the Camila plant to process material into concentrates and expects to prioritize construction of its fully permitted on-site Bethania plant. Source 2
Reported project location -12.6377, -75.5291
- Mine type
- Underground
- Region
- South America
- Property area
- 5,600 ha
- Location
- Acobambilla district, Huancavelica, Peru
- Access
- Road from Huancayo
- Infrastructure
- Underground workings, compressor and camp accommodations
- Power
- On-site electrical generator
- Water
- Underground water distribution
- Land position
- Approximately 5,600 hectares across Bethania, Carmelitas and Tres Banderas
- Permits
- Fully permitted on-site Bethania plant
- Geology
- Broadly subparallel and subvertical vein systems at Santa Elena
- Deposit type
- Structurally controlled silver-polymetallic veins
- Mining method
- Underground ascending cut and fill
- Processing
- Toll milling at the Camila flotation plant
- Ownership history
- Acquisition of Minera Toro del Plata and its Santa Elena concession in 2020
Company plans
Milestones
The company's own stated steps and plans, earliest first, each from the newest document that states it.
Dec 15, 2020
Kuya completed the purchase of Minera Toro del Plata, owner of the Bethania Silver Property.
May 14, 2021
Kuya announced the acquisition of the Carmelitas concessions near Bethania.
Oct 23, 2023
Kuya issued a release announcing the filing of the amended and restated Bethania technical report.
May 21, 2024
Kuya announced the commencement of production at the Bethania silver mine.
Oct 22, 2024
Kuya announced its first concentrate sale from Bethania.
May 2025 to Jun 2025
Kuya delineated the Millococha Oeste and Millococha Norte silver-vein areas at Bethania.
Q3 2026
Kuya decided to prioritize mine development over near-term production at Bethania.
- Today
Oct 14, 2026
Kuya closed a transaction with Camila, replacing its earlier letter of intent with a toll-milling and financing agreement that secures access to expanding processing capacity.
H2 2026
Kuya plans 2-3 Bethania project drill results updates.
Mineral inventory
Resources and reserves
Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.
Mineral resources as at Dec 10, 2021NI 43-101
- Total silver eq.
- 14.39Moz AgEq
- Indicated + Inferred
- Indicated
- 6.09Moz AgEq
- 42% of the total
- Inferred
- 8.3Moz AgEq
- 58% of the total
- Market cap per resource ounce
- US$3.59/ oz AgEq
- All categories
Reported estimate. The total combines categories of different confidence; inferred resources are not reserves. Source
How market cap per ounce is calculated
Kuya Silver Corporation · US$51.7M market cap
All categories US$3.59 / oz AgEq · Indicated US$8.50 / oz AgEq · Inferred US$6.23 / oz AgEq
Each figure divides the whole company market cap by that category's reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-11-20 · FX 2026-11-20.
| Category | Tonnage | Grade | Contained metal | Cut-off | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Silverg/t | Goldg/t | Lead% | Zinc% | Copper% | Silver eq.g/t | SilverMoz | Silver eq.Moz | |||
| Indicated | — | 332 | 0.26 | 2.67 | 1.95 | 0.16 | 469 | 4.31 | 6.09 | — |
| Inferred | — | 249 | 0.24 | 2.51 | 1.58 | 0.12 | 369 | 5.6 | 8.3 | — |
| TotalIndicated + Inferred | 9.92 | 14.39 | ||||||||
The total adds Indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal.
Shaded columns are equivalent figures. An equivalent column combines the metals beside it on the company's own price assumptions. It is not additional metal and must not be added to them.
Operating performance
Production
Performance at a glance
Q3 2026 · Quarter
Silver eq. processed
16.06K oz
Silver processed: 12,179 oz
Revenue
1.3M USD
Bars show the last four matching periods, oldest to newest. Gaps mean unavailable data. Changes compare matching metals, currencies and reporting bases; source figures appear below.
Figures as published by the company, in the units they were reported in. The latest period is open; select any other to expand it.
Reported production by period
16 reported periods · never added togetherQ3 2026Quarter———approx. US$1.30M
- Revenue
- US$1.30M
| Reported | Silver | Silver eq. |
|---|---|---|
| Processed | 12,179 oz | — |
| Equivalent ounces processed | — | 16,055 oz |
Source Kuya Silver Reports Record Underground Development at Bethania in Q3 2026 · Oct 29, 2026
Q3 2026Quarter14,243 oz15,993 oz—approx. US$1.30M
- Ore mined
- 3,401 t
- Ore processed
- 2,696 dmt
- Revenue
- US$1.30M
- Development
- 4,713 t
- Silver - Lead (Bethania)
- 118 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 5.43 oz/t | 1.55% | 1.53% | 8.5 oz/t |
| Recovery | 83.26% | 78.77% | 30.13% | — |
| Metal produced | 14,243 oz | — | — | 15,993 oz |
| Equivalent ounces processed | — | — | — | 16,055 oz |
| Metal payable | 9,645 oz | — | — | 12,698 oz |
| Processed | 12,179 oz | — | — | — |
| Metal processed | — | 33 t | 12 t | 13,974 oz |
| Concentrates sold | — | — | 74 t | — |
Source Kuya Silver Reports Record Underground Development at Bethania in Q3 2026 · Oct 29, 2026
Q2 2026Quarter——US$72.00/ozUS$1.25M
Company operating table: Bethania Silver Project and Silver Kings Project
- Ore mined
- 5,097 t
- Ore processed
- 5,075 dmt
- Revenue
- US$1,253k
- Development
- 1,535 t
- Concentrates sold: Silver - Lead (Bethania)
- 149 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 5.91 oz/t | 1.43% | 1.48% | 274 g/t8.82 oz/t |
| Recovery | 79.72% | 80.87% | 32.51% | — |
| Metal sold | 17,450 oz | 41 t | 22 t | 20,006 oz |
| Realized price | US$72.00/oz | US$1,889/t | US$3,445/t | — |
| Metal processed: Equivalent (2) | — | — | — | 30,559 oz |
| Sales | 87% | — | — | — |
| Metal processed: | 23,912 oz | 73 t | 75 t | — |
| Concentrates sold: (Bethania) | — | — | 91 t | — |
Source Management’s Discussion and Analysis (June 30, 2026) · Jun 30, 2026
Q2 2026Quarter——US$72.00/ozUS$1.25M
Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 5,097 t
- Ore processed
- 5,075 dmt
- Revenue
- US$1,253k
- Development
- 1,535 t
- Concentrates sold: Silver - Lead (Bethania)
- 149 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 5.91 oz/t | 1.43% | 1.48% | 274 g/t8.82 oz/t |
| Recovery | 79.72% | 80.87% | 32.51% | — |
| Metal sold | 17,450 oz | 41 t | 22 t | 20,006 oz |
| Realized price | US$72.00/oz | US$1,889/t | US$3,445/t | — |
| Sales | 87% | — | — | — |
| Metal processed: Equivalent (2) | — | — | — | 30,559 oz |
| Metal processed: | 23,912 oz | 73 t | 75 t | — |
| Concentrates sold: (Bethania) | — | — | 91 t | — |
Source Management’s Discussion and Analysis (June 30, 2026) · Jun 30, 2026
Q1 2026Quarter——US$82.00/ozUS$1.47M
Company operating table: Bethania Silver Project and Silver Kings Project
- Ore mined
- 3,076 t
- Ore processed
- 3,868 t
- Revenue
- US$1,465k
- Development
- 1,967 t
- Concentrates sold: Silver - Lead
- 120 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 6.29 oz/t | 2.02% | 1.63% | 9.94 oz/t309 g/t |
| Recovery | 86.46% | 86.73% | 44.46% | — |
| Metal sold | 17,481 oz | 54 t | 9 t | 19,266 oz |
| Realized price | US$82.00/oz | US$1,859/t | US$3,300/t | — |
| Metal processed: | 21,580 oz | 63 t | 45 t | — |
| Sales | 91% | — | — | — |
| Concentrates sold: | — | — | 72 t | — |
Source Management’s Discussion and Analysis (March 31, 2026) · Mar 31, 2026
Q1 2026Quarter——US$82.00/ozUS$1.47M
Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 3,076 t
- Ore processed
- 3,868 t
- Revenue
- US$1,465k
- Development
- 1,967 t
- Concentrates sold: Silver - Lead
- 120 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 6.29 oz/t | 2.02% | 1.63% | 309 g/t9.94 oz/t |
| Recovery | 86.46% | 86.73% | 44.46% | — |
| Metal sold | 17,481 oz | 54 t | 9 t | 19,266 oz |
| Realized price | US$82.00/oz | US$1,859/t | US$3,300/t | — |
| Sales | 91% | — | — | — |
| Metal processed: | 21,580 oz | 63 t | 45 t | — |
| Concentrates sold: | — | — | 72 t | — |
Source Management’s Discussion and Analysis (March 31, 2026) · Mar 31, 2026
2025Year——US$42.00/ozUS$2.47M
Reported as "FY 2025" · Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 4,295 t
- Ore processed
- 4,283 t
- Revenue
- US$2,467k
- Concentrates sold: Silver - Lead
- 174 t
- Development
- 6,426 t
| Reported | Silver | Gold | Lead | Zinc | Silver eq. |
|---|---|---|---|---|---|
| Head grade | 9.15 oz/t | — | 1.64% | 1.63% | 386 g/t12.41 oz/t |
| Recovery | 85.29% | — | 85.67% | 59.5% | — |
| Metal sold | 87,262 oz | 6 oz | 86 t | 48 t | 94,596 oz |
| Realized price | US$42.00/oz | US$3,192/oz | US$1,963/t | US$2,879/t | — |
| Sales | 92% | — | — | — | — |
| Metal processed: | 34,155 oz | — | 98 t | 79 t | — |
| Concentrates sold: Speciality | 1,800 t | — | — | — | — |
| Concentrates sold: | — | — | — | 117 t | — |
Source Management's Discussion and Analysis (December 31, 2025) · Dec 31, 2025
2025Year——US$42.00/ozUS$2.47M
Reported as "FY 2025" · Company operating table: Bethania Silver Project and Silver Kings Project
- Ore mined
- 4,295 t
- Ore processed
- 4,283 t
- Revenue
- US$2,467k
- Concentrates sold: Silver - Lead
- 174 t
- Development
- 6,426 t
| Reported | Silver | Gold | Lead | Zinc | Silver eq. |
|---|---|---|---|---|---|
| Head grade | 9.15 oz/t | — | 1.64% | 1.63% | 12.41 oz/t386 g/t |
| Recovery | 85.29% | — | 85.67% | 59.5% | — |
| Metal sold | 87,262 oz | 6 oz | 86 t | 48 t | 94,596 oz |
| Realized price | US$42.00/oz | US$3,192/oz | US$1,963/t | US$2,879/t | — |
| Sales | 92% | — | — | — | — |
| Concentrates sold: Speciality | 1,800 t | — | — | — | — |
| Metal processed: | 34,155 oz | — | 98 t | 79 t | — |
| Concentrates sold: | — | — | — | 117 t | — |
Source Management's Discussion and Analysis (December 31, 2025) · Dec 31, 2025
Q4 2025Quarter——US$57.00/ozUS$321k
Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 1,999 t
- Ore processed
- 1,570 t
- Revenue
- US$321.00k
- Development
- 2,318 t
- Concentrates sold: Silver - Lead
- 37 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 6 oz/t | 1.4% | 1.1% | 264 g/t8.5 oz/t |
| Recovery | 73.3% | 79.1% | 57.1% | — |
| Metal sold | 5,441 oz | 15 t | 8 t | 6,194 oz |
| Realized price | US$57.00/oz | US$1,953/t | US$3,047/t | — |
| Metal processed: | 7,724 oz | 18 t | 15 t | — |
| Sales | 88% | — | — | — |
| Concentrates sold: | — | — | 22 t | — |
Source Management's Discussion and Analysis (December 31, 2025) · Dec 31, 2025
Q4 2025Quarter——US$57.00/ozUS$321k
Company operating table: Bethania Silver Project and Silver Kings Project
- Ore mined
- 1,999 t
- Ore processed
- 1,570 t
- Revenue
- US$321.00k
- Development
- 2,318 t
- Concentrates sold: Silver - Lead
- 37 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 6 oz/t | 1.4% | 1.1% | 264 g/t8.5 oz/t |
| Recovery | 73.3% | 79.1% | 57.1% | — |
| Metal sold | 5,441 oz | 15 t | 8 t | 6,194 oz |
| Realized price | US$57.00/oz | US$1,953/t | US$3,047/t | — |
| Metal processed: | 7,724 oz | 18 t | 15 t | — |
| Sales | 88% | — | — | — |
| Concentrates sold: | — | — | 22 t | — |
Source Management's Discussion and Analysis (December 31, 2025) · Dec 31, 2025
Q3 2025Quarter—24,974 oz——
- Ore mined
- 417 t
- Development
- 405 t
- Silver - Lead (Bethania)
- 98 t
| Reported | Zinc | Silver eq. |
|---|---|---|
| Head grade | — | 16.75 oz/t |
| Metal produced | — | 24,974 oz |
| Metal processed | — | 24,335 oz |
| Metal payable | — | 21,436 oz |
| Concentrates sold | 66 t | — |
Source Kuya Silver Reports Record Underground Development at Bethania in Q3 2026 · Oct 29, 2026
Q3 2025Quarter——US$40.00/ozUS$767k
Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 417 t
- Ore processed
- 1,841 t
- Revenue
- US$767.00k
- Development
- 405 t
- Concentrates sold: Silver - Lead
- 98 t
| Reported | Silver | Gold | Lead | Zinc | Silver eq. |
|---|---|---|---|---|---|
| Head grade | 10.82 oz/t | — | 3.32% | 2.61% | 13.87 oz/t431 g/t |
| Recovery | 91.63% | — | 90.5% | 66% | — |
| Metal sold | 16,983 oz | 4 oz | 53 t | 30 t | 21,436 oz |
| Realized price | US$40.00/oz | US$3,366/oz | US$1,953/t | US$2,818/t | — |
| Metal processed: | 18,985 oz | — | 58 t | 46 t | — |
| Sales | 79% | — | — | — | — |
| Concentrates sold: | — | — | — | 66 t | — |
Source Management's Discussion and Analysis (December 31, 2025) · Dec 31, 2025
Q2 2025Quarter——US$37.00/ozUS$1.15M
Company operating table: Bethania Silver Project and Silver Kings Project
- Ore mined
- 1,224 t
- Revenue
- US$1,150k
- Development
- 1,774 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 10.73 oz/t | 3.64% | 2.52% | 14.89 oz/t463 g/t |
| Metal sold | 58,078 oz | — | — | 58,078 oz |
| Realized price | US$37.00/oz | — | — | — |
| Sales | 100% | — | — | — |
| Concentrates sold: Speciality | 1,800 t | — | — | — |
| Concentrates sold: Speciality ( Kings) | 1,800 t | — | — | — |
Source Management’s Discussion and Analysis (June 30, 2026) · Jun 30, 2026
Q2 2025Quarter——US$37.00/ozUS$1.15M
Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 1,224 t
- Revenue
- US$1,150k
- Development
- 1,774 t
| Reported | Silver | Lead | Zinc | Silver eq. |
|---|---|---|---|---|
| Head grade | 10.73 oz/t | 3.64% | 2.52% | 14.89 oz/t463 g/t |
| Metal sold | 58,078 oz | — | — | 58,078 oz |
| Realized price | US$37.00/oz | — | — | — |
| Concentrates sold: Speciality | 1,800 t | — | — | — |
| Concentrates sold: Speciality ( Kings) | 1,800 t | — | — | — |
| Sales | 100% | — | — | — |
Source Management’s Discussion and Analysis (June 30, 2026) · Jun 30, 2026
Q1 2025Quarter——US$33.00/ozUS$229k
Company operating table: Bethania Silver Project and Silver Kings Project
- Ore mined
- 655 t
- Ore processed
- 872 t
- Revenue
- US$229.00k
- Development
- 1,930 t
- Concentrates sold: Silver - Lead
- 39 t
| Reported | Silver | Gold | Lead | Zinc | Silver eq. |
|---|---|---|---|---|---|
| Head grade | 9.05 oz/t | — | 2.6% | 2.23% | 12.39 oz/t385 g/t |
| Recovery | 90.94% | — | 87.4% | 55.4% | — |
| Metal sold | 6,760 oz | 2 oz | 18 t | 10 t | 8,888 oz |
| Realized price | US$33.00/oz | US$3,017/oz | US$1,984/t | US$2,773/t | — |
| Sales | 76% | — | — | — | — |
| Metal processed: | 7,445 oz | — | 22 t | 18 t | — |
| Concentrates sold: | — | — | — | 29 t | — |
Source Management’s Discussion and Analysis (March 31, 2026) · Mar 31, 2026
Q1 2025Quarter——US$33.00/ozUS$229k
Company operating table: Silver Kings Project and Bethania Silver Project
- Ore mined
- 655 t
- Ore processed
- 872 t
- Revenue
- US$229.00k
- Concentrates sold: Silver - Lead
- 39 t
- Development
- 1,930 t
| Reported | Silver | Gold | Lead | Zinc | Silver eq. |
|---|---|---|---|---|---|
| Head grade | 9.05 oz/t | — | 2.6% | 2.23% | 12.39 oz/t385 g/t |
| Recovery | 90.94% | — | 87.4% | 55.4% | — |
| Metal sold | 6,760 oz | 2 oz | 18 t | 10 t | 8,888 oz |
| Realized price | US$33.00/oz | US$3,017/oz | US$1,984/t | US$2,773/t | — |
| Sales | 76% | — | — | — | — |
| Metal processed: | 7,445 oz | — | 22 t | 18 t | — |
| Concentrates sold: | — | — | — | 29 t | — |
Source Management’s Discussion and Analysis (March 31, 2026) · Mar 31, 2026
Shaded columns are equivalent figures. An equivalent column combines the metals beside it on the company's own price assumptions. It is not additional production and must not be added to them.
Companies behind the asset
Ownership & project roles
- Kuya Silver CorporationOwner Source
- Kuya Silver CorporationOperator · runs the project, does not imply ownership Source