The asset
Project overview
Berenguela is in the Altiplano of southeastern Peru, in the Department of Puno, near Santa Lucia. The project is reachable from Arequipa by sealed road. Aftermath Silver owns the project. Source 2 3
Berenguela is interpreted as a carbonate replacement deposit. Its manganese oxide mineralization is hosted principally in folded limestone and dolomitized limestone, with associated silver, copper and zinc enrichment. Aftermath's drilling included a surface intersection of 156m @ 290g/t Ag, 1.12% Cu and 7.3% Mn in AFD100. The mineral resource estimate includes measured and indicated resources of 122.5 million ounces of silver and 717.1 million pounds of copper; mineral resources are not mineral reserves. Source 2 3
The project is undeveloped and a pre-feasibility study is underway. Aftermath says most infill drilling is complete and process testwork is in progress. The company reports the study is on schedule for completion in Q1 2027 and is examining an open-pit operation with mineralized rock shipped by rail to a processing facility near Matarani. Source
Reported approximate project location (15°39’30” S, 70°34’06” W) -15.6583, -70.5683
- Mine type
- Open pit
- Location
- Altiplano, Department of Puno, southeastern Peru
- Access
- 4 hours from Arequipa by sealed road
- Infrastructure
- Railway loading station at Santa Lucia, connected to Matarani port
- Power
- Grid power in the local area
- Water
- Water resources and potable water supply in the local area
- Permits
- Authorization received for SW Intrusive target drilling
- Geology
- Manganese oxide replacement mineralization in folded limestone and dolomitized limestone
- Deposit type
- Carbonate replacement deposit
- Mining method
- Open pit contemplated in the pre-feasibility study
- Processing
- Processing facility near Matarani contemplated in the pre-feasibility study
- Ownership history
- Acquired by Aftermath from SSR Mining
Exploration
Drill results
- Reported intercepts
- 427
- 198 holes · 17 releases
- Best grade × width (Ag)
- 45,240 g/t·m
- AFD100: 156.00 m @ 290 g/t
- Longest interval
- 156.00 m
- AFD100
- Highest grade (Ag)
- 16,151 g/t
- AFD100 over 0.95 m
1AFD100Eastern Synform · from 0.00 m
156.00 m290 g/t Ag45,240 g/t·mFeb 27, 2025
2AFD 100from surface m
156 m290 g/t Ag45,240 g/t·mDec 4, 2025+1
3AFD100Eastern Synform · from 27.30 m
6.90 m4877 g/t Ag33,651 g/t·mFeb 27, 2025
4AFD100Eastern Zone · from 29.30 m
1.95 m14,252 g/t Ag27,791 g/t·mFeb 27, 2025
5AFD-034from 0.00 m
65.25* m408 g/t Ag26,622 g/t·mJun 6, 2022
6AFD160Berenguela · from 0.00 m
45.80 m528 g/t Ag24,182 g/t·mMar 25, 2026
7AFD-034from 39.70 m
18.95* m1,162 g/t Ag22,020 g/t·mJun 6, 2022
8AFD-034from 39.7 m
18.9 m1,162 g/t Ag21,962 g/t·mJun 6, 2022
9AFD160Berenguela · from 18.40 m
29.50 m737 g/t Ag21,742 g/t·mMar 25, 2026
10AFD152Berenguela · from 26.50 m
48.50 m438 g/t Ag21,243 g/t·mMar 25, 2026
11AFD-029from 0.00 m
97.60* m188 g/t Ag18,349 g/t·mJun 6, 2022
12AFD-048from 0.00 m
35.90 m508 g/t Ag18,237 g/t·mJun 13, 2022
How to read this
Every intercept the company has reported with numbers, as printed in its releases. A bar's length is grade × width and a darker bar is a higher reported Ag grade. Grade × width multiplies a row's own reported interval and grade (gram metres for g/t, percent metres for %); it is a product of reported figures, not a company figure, and is only formed for intervals in metres. Intervals are drilled widths unless the company states true widths, and an "including" interval is part of the one above it, not additional.
Company plans
Milestones
The company's own stated steps and plans, earliest first, each from the newest document that states it.
Feb 29, 2024
Aftermath reported that Berenguela metallurgical testwork had produced battery-grade manganese sulphate crystals.
Dec 4, 2025
Aftermath announced a new mineral resource estimate for Berenguela.
Dec 29, 2025
Aftermath completed its acquisition of Berenguela.
Feb 12, 2026
Aftermath launched the Berenguela pre-feasibility study.
Feb 19, 2026
Aftermath appointed DRA Global to lead the Berenguela pre-feasibility study.
- Today
Jul 22, 2026
Aftermath reported that drilling had begun at Berenguela's eastern copper target.
Plannedstated Nov 2026
The company expects to complete the pre-feasibility study.
Mineral inventory
Resources and reserves
Explore the reported mineral inventory, from headline totals to individual deposits. Resources and reserves remain separate; equivalent metal uses the company’s own assumptions.
Mineral resources as at Nov 30, 2025Standard not stated
- Total silver
- 144.5Moz silver
- Measured & indicated + Inferred
- Measured & indicated
- 122.5Moz silver
- 85% of the total
- Inferred
- 22Moz silver
- 15% of the total
- Market cap per resource ounce
- US$0.68/ oz silver
- All categories
Reported estimate. The total combines categories of different confidence; inferred resources are not reserves. Source
How market cap per ounce is calculated
Aftermath Silver Ltd · US$98.9M market cap
All categories US$0.68 / oz silver · Measured & indicated US$0.81 / oz silver · Inferred US$4.50 / oz silver
Each figure divides the whole company market cap by that category's reported ounces in this estimate. No ownership adjustment; other company assets are not deducted. Resource ounces are not recoverable production or cash value. Share price 2026-11-20 · FX 2026-11-20.
Indicative silver equivalent
GoldSilver calculation, not company-reportedPrice-based illustration from the company’s reported contained metals. Assumes 100% recovery and payability for every metal and excludes mining costs. Loading latest available metal prices….
Metal prices & calculation
AgEq ounces = silver ounces + each other metal’s contained amount × its price ÷ the silver price. Ounces and pounds are matched to the price units shown. This is gross in-situ metal value expressed as silver, not a recoverable resource estimate. Company-reported AgEq totals exclude this illustration.
| Category | TonnageMt | Grade | Contained metal | Cut-off | ||||
|---|---|---|---|---|---|---|---|---|
| Silverg/t | Zinc% | Copper% | SilverMoz | ZincMlb | CopperMlb | |||
| Measured | 8.49 | 101 | 0.32 | 0.89 | 27.7 | 60 | 166.9 | — |
| Indicated | 43.06 | 68.5 | 0.33 | 0.58 | 94.9 | 312.5 | 550.2 | — |
| Measured & indicatedsubtotal | 51.55 | 73.9 | 0.33 | 0.63 | 122.5 | 372.4 | 717.1 | — |
| Inferred | 14.33 | 47.6 | 0.25 | 0.37 | 22 | 80 | 118.4 | — |
| TotalMeasured & indicated + Inferred | 65.88 | 68.18* | 0.31* | 0.57* | 144.5 | 452.4 | 835.5 | |
The total adds Measured & indicated + Inferred, categories of different confidence; it is a sum of the reported rows, not a reported figure. Equivalent columns are totalled only with themselves, never added to a metal. * Grade weighted by tonnage from the rows above.
Companies behind the asset
Ownership & project roles
- Aftermath Silver LtdOwner Source100%